University of Waikato Research
Permanent URI for this communityhttps://researchcommons.waikato.ac.nz/handle/10289/10288
Browse
5 results
Search Results
Item type:Publication, Scheduling contractors' farm-to-farm crop harvesting operations2006, Blackwell PublishingThe harvesting of renewable resources from an operations scheduling viewpoint is introduced, and a harvesting scenario arising in the agricultural context involving a commercial contracting enterprise that travels from farm-to-farm harvesting crops is discussed. This paper is an extension of previous work by two of the authors from the one-farm to the multi-farm case. In both cases, the duration of each operation is dependent upon the combination of constrained resources allocated to it, equipment and worker allocation is restricted, and minimum or maximum time lags on the start and completion of operations may be imposed. The present case incorporates harvesting at more than one farm and thus the sequence in which the farms are visited and the inter-farm travel times must be taken into account. We report on a harvesting scheduling model and solution procedures designed specifically for large-scale versions of the multi-farm case. The computational times experienced in solving general instances of the model of small-to-medium practical size by a commercial integer programming package are encouraging. Greedy and tabu search heuristics, which are capable of solving problems of relatively large dimensions in reasonable computational time are also included. The authors believe that the model and the solution techniques developed represent a useful addition to the farm crop contractor's tool kit.Item type:Publication, Innovation of e-procurement: a case study2006, InderscienceMany organisations are increasingly searching for innovative processes and methods to achieve competitive advantage and to more fully take advantage of what they have in order to improve. This article is an illustration of this in a particular company that investigated how to improve its e-procurement processes through business innovation. Specifically, it describes how the e-procurement process can be improved by taking advantage of information technology and systems for business innovation. We explore the possibility of applying Project Management (PM) principles in order to enhance e-procurement. An understanding of the issues involved has been gained through a case study of Motorola China Inc., which has implemented a fully functional e-procurement process since 2002. Our findings establish the potential benefits, feasibility and utility of applying PM technology as a way of enhancing the existing e-procurement process. The case study also indicates that the existing planning, reporting and database management systems are likely to enhance the PM process.Item type:Publication, Bridge lane direction specifications for sustainable traffic management2006, World Scientific PublishingWe present a deterministic model that specifies lane direction in a multi-laned bridge that has a movable barrier that divides the two directions of traffic flow, in order to reduce congestion. A probabilistic dynamic programming formulation for a stochastic extension of the model is also presented. Analysis of the special structure of the dynamic programming formulation provides new insights into important aspects of certain traffic planning problems and represents a useful addition to the traffic network planner's toolkit. A case study involving the lane direction management of an actual bridge is also provided.Item type:Publication, A probabilistic dynamic programming model of rape seed harvesting2006, InderscienceWe discuss a practical scenario from an operations scheduling viewpoint involving commercial contracting enterprises that visit farms in order to harvest rape seed crops. We report on a probabilistic dynamic programming formulation that was designed specifically for scenarios of the type described. The paper is an extension of previous work from the deterministic one-farm case to allow for: the specific considerations necessary to harvest a particular crop, namely rape seed, harvesting at multiple farms, machine failure, and the fact that activity duration times are uncertain. The computational times experienced in solving practical instances of the formulation are encouraging.Item type:Publication, Farmers Reap Benefits of DSS2006-04, INFORMSMaize farming in New Zealand is an important activity contributing a significant proportion of the output of the agricultural sector. Commercial contractors form an important part of the harvesting process by traveling from farm to farm harvesting maize. Traditionally, commercial harvesters have difficulty in deciding when to harvest different farms within a short period in time, taking into consideration various limitations such as limited dedicated machines and crews. We report here on the development of a scheduling and decision-making support system (DSS) that assists commercial harvesters in scheduling their activities. We also present the outcomes of the implementation of the system by a large commercial harvester.