<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">

University of Waikato Research

Permanent URI for this communityhttps://researchcommons.waikato.ac.nz/handle/10289/10288

Browse

Search Results

Now showing 1 - 3 of 3
  • Item type:Publication,
    Open-source tool for heat exchanger network synthesis
    2022-09-05
    The synthesis of heat exchanger networks (HEN) is not a trivial task due to the mixed integer and non-linear nature of the optimisation problem, yet it can provide significant cost and energy use savings to an industrial processing site. Many HEN synthesis models are developed using propriety solvers, which make it difficult for industrial companies to realise the potential of optimisation. This paper introduces a new open-source tool for HEN synthesis built in Python using the GEKKO library, which interfaces with the solver APOPT. The tool features three different synthesis methods, two of which utilise a two-step method where step one aims to initialise or narrow the search space prior to global optimisation in the second synthesis step. A unique feature of this work compared to previous HEN synthesis studies is the application of a true driving force constraint, dQ/dA, (instead of the conventional, but at times crude, minimum approach temperature, ∆Tmin) to provide feasible initial variable values to the second step. To demonstrate the current progress in developing the open-source tool, network solutions obtained by the tool were purposefully compared with the best reported solutions for three common case studies in HEN synthesis literature. For a small problem, the tool achieved a solution within 0.02 % of the best literature solution and attained a solution for the two larger problems within 4 % and 21% of the best literature solution. Before the tool can be made publicly available, further work is needed to implement a non-isothermal mixing model across stream splits, which is expected to yield a more optimal HEN.
  • Item type:Publication,
    Total site utility system structural design using P-graph
    2018
    This paper explores the macro optimisation decisions of energy sources selection and the structural design of the utility system within the framework of Total Site Heat Integration (TSHI). Most TSHI research on utility systems focuses on optimisation of conventional Combined Heat and Power systems. To build a new Utility Systems Planner (USP) tool, P-graph has been selected as the optimisation tool. A critical element of USP is the inclusion of low-grade heat utilisation technologies within the considered superstructure. The USP outputs include the optimal structure of the utility system including the arrangement and size of each component and estimates for Greenhouse Gas and Water Footprints. The successful application of the USP to a representative industrial case study with district energy integration shows an optimal solution with a natural gas boiler, reciprocating gas engine, condensing economiser, steam turbine, thermocompressor, organic Rankine cycle, cooling tower, and electric chiller with a total cost of 14.893 M€/y. The new tool is a platform for launching further research including site-specific application, multi-period optimisation, and sensitivity analysis.
  • Item type:Publication,
    Total site methodology as a tool for planning and strategic decisions
    2012, AIDIC Servizi S.r.l.
    A Total Site (TS) is defined as a set of processes (industrial plants, residential, business and agriculture units) linked through the central utility system. The utility system incorporates a number of operating units such as boilers, steam turbines, gas turbines and letdown stations. Many sites are using the TS system representation. Heat Integration at TS level has been well developed and successfully implemented. However, sites typically develop with time and even minor changes/extensions can affect TS heat recovery significantly. It is beneficial to plan their strategic development in advance, to increase or at least not to decrease the rate of heat recovery when integration of additional processes takes place. Even when this has not been done at the initial stage, the TS methodology can still be used as a tool for the strategic planning decision making. This work illustrates how the TS methodology can contribute to the strategic development and the extension planning of already existing TS. The aim is to reveal the potentials for Heat Integration, when new units or processes are considered for the inclusion in the TS. Moreover, some operating parameters (e.g. temperature or capacity) of the unit can be proposed to achieve the best possible heat recovery. The degrees of freedom for TS changes can be on two levels: (i) only adding an operating unit to the current utility system (the Total Site Profiles remain the same) or (ii) changing of the TS by including more processes (the Total Site Profiles are changed). The first group of changes includes the integration of heat engines to produce electricity utilising heat at higher temperature and returning it to the system at lower temperature, which is still acceptable for the heat recovery and simultaneously for the electricity production. The second group of changes is more complex. For evaluating these changes a plus/minus principle is developed allowing the most beneficial integration of new units to the TS. Combinations of both types of changes are also considered.