<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">

University of Waikato Research

Permanent URI for this communityhttps://researchcommons.waikato.ac.nz/handle/10289/10288

Browse

Search Results

Now showing 1 - 4 of 4
  • Item type:Publication,
    Parameterisation of sediment geochemistry for simulating water quality responses to long-term catchment and climate changes in polymictic, eutrophic Lake Rotorua, New Zealand
    2012, WIT Press
    Numerical models of aquatic ecosystems that couple physics and biogeochemistry are valuable tools in aquatic ecosystem research. These models provide opportunities to test theories and to inform environmental management. In this study, we used the dynamic, process-based hydrodynamic-ecological model DYRESM-CAEDYM to simulate key ecosystem processes of Lake Rotorua, New Zealand, for six 8-year periods between 1920 and 2100 in order to evaluate the potential effects of future changes in land use and climate. Longterm variations in external boundary conditions (e.g. inflows) to the lake ecosystem are incorporated by varying the relevant input files in the DYRESMCAEDYM model. However, quantification of internal lake processes, specifically those at the sediment-water interface, presents a major challenge for long-term simulations. The sediment model within CAEDYM is ‘static’, with assumed constant sediment composition and a relatively simplistic process representation for nutrient and oxygen fluxes between sediment and water. Specifically, the model regulates sediment phosphate and ammonium release according to concentrations of oxidising species (i.e. oxygen and nitrate), and temperature in the overlying water layer. Sediment oxygen demand is controlled by dissolved oxygen concentrations and temperature in the water layer overlying the sediments. We used a ‘trial and error’ approach to estimate parameters for calibrating and validating the model, and regression modelling to infer the parameters beyond the calibration/validation simulation period (2001–2009). We observed a significant relationship in historic monitoring data between the external nitrogen load to the lake and its hypolimnetic oxygen demand as well as the bottom-sediment nitrogen concentrations. This relationship was used to hindcast and forecast model parameters for sediment nutrient release and oxygen demand in the six model simulation periods. The inclusion of a dynamic response of sediment nutrient release and oxygen demand parameters to changes in external nutrient loads enabled a more conceptually concise simulation of water quality for the simulations. This model is currently being used by regional environmental management authorities for developing an Action Plan for the restoration of Lake Rotorua.
  • Item type:Publication,
    Modelling the response of a highly eutrophic lake to reductions in external and internal nutrient loading
    2011-06, Taylor & Francis
    The reduction of macronutrients to levels that limit primary production is often a critical element of mitigating eutrophication and reducing the potential for algal blooms. Lake Okaro has remained highly eutrophic despite an intensive catchment and in-lake restoration programme, including implementation of a constructed wetland, riparian protection, an alum application and application of a modified zeolite mineral (Z2G1) to reduce internal nutrient loading. A one-dimensional process-based ecosystem model (DYRESM-CAEDYM) was used in this study to investigate the need for further nutrient loading reductions of both nitrogen (N) and phosphorus (P). The model was calibrated against field data for a 2-year period and validated over two separate 1-year periods. Model simulations suggest that the trophic status of the lake, measured quantitatively with the Trophic Level Index (TLI), could shift from highly eutrophic to mesotrophic with external and internal loads of both N and P reduced by 75-90%. The magnitude of the nutrient load reductions is indicative of a major challenge in being able to effect transitions across trophic state categories for eutrophic lakes.
  • Item type:Publication,
    Effects of a modified zeolite on P and N processes and fluxes across the lake sediment–water interface using core incubations
    2011, SpringerLink
    A new locally produced P-inactivation agent, Z2G1, was tested on sediment cores from Lake Okaro, New Zealand, for phosphorus (P) removal efficacy and any non-target side effects prior to a whole lake trial to manage internal P loading. Z2G1 is a granular product which settles rapidly, and was designed as a sediment capping material. It is a modified zeolite which acts as a carrier for the aluminium (Al)-based P-binding agent. It was found to have a high affinity for P and did not release Al into the water column. Continuous-flow incubation study results showed that a thin layer of Z2G1 (~2 mm) could completely block the release of P from the sediment under aerobic and anoxic conditions, and remove P from the overlying water in contact with the capping layer. The Z2G1 capping layer neither released metals itself nor did it induce the release of metals from the sediments, and the zeolite substrate absorbed arsenic and mercury from the geothermally influenced Lake Okaro sediments. In general, zeolites are strong cation absorbers and the zeolite substrate of Z2G1 absorbed ammoniacal nitrogen, making it the only sediment capping material to actively remove both P and N. There were, however, indications of a suppression effect on microbial denitrification by the Z2G1 capping layer under aerobic conditions. Overall, the Z2G1 sediment capping material is a highly effective P-inactivation agent which might be a useful material for managing internal P loads in eutrophic lakes.
  • Item type:Publication,
    Sustainability assessment and comparison of efficacy of four P-inactivation agents for managing internal phosphorus loads in lakes: sediment incubations
    2010, Springer
    A novel application of a continuous flow incubation system (CFIS) was used to assess four phosphorus (P) inactivation agents—alum, Phoslock™, a new modified zeolite (Z2G1 or Aqual-P™), and allophone—when used as sediment capping agents to manage internal P loads in lakes. The CFIS technique allowed combined efficacy and sustainability assessment, including: (1) flux measurements during simulation of stratified (anoxic) and mixed (aerobic) conditions on the same sediment through multiple cycles to assess the longevity of a range of product doses; (2) simulation of a summer algal bloom collapse and subsequent burial of the products; and (3) investigation of non-target effects on nitrification and denitrification processes at the sediment–water interface. Minimum P-removal dose rates were found to differ substantially at 80 g m⁻² for alum, 190 g m⁻² for Z2G1, 220 g m⁻² for allophane and 280 g m⁻² for Phoslock™, for similar capping layer thickness of about 2 mm, and would be effective for at least 4 years. All products temporarily suppressed nitrification and denitrification under aerobic conditions, and it may be important to minimise product application to any permanently aerobic zones, such as the littoral areas of a lake. While the aluminium (Al)-based products did not enhance Al fluxes in the CFIS, lanthanum (La) was released at a near constant rate of around 2 mg La m⁻² day⁻¹ from the Phoslock™ treatments over a period of at least 14 days. Spatial variability of sediment P, bioturbation, and burial are factors that will affect up-scaling these results to a whole lake.