Assessment of the stream conditions associated with the Hudson Street Gully erosion control works
| dc.contributor.author | Hicks, Brendan J. | |
| dc.contributor.author | Reynolds, Gavin B. | |
| dc.contributor.author | Jamieson, Paul M. | |
| dc.date.accessioned | 2024-07-18T22:14:11Z | |
| dc.date.available | 2024-07-18T22:14:11Z | |
| dc.date.issued | 2001 | |
| dc.description.abstract | Before the commencement of the Hudson Street Gully erosion control works there were two waterfalls and a 58–m long culvert on the Hudson Street Gully Stream. The works have replaced the 3-m waterfall at the confluence of the stream with the Waikato River with a 75-m concrete pipe culvert with a fall of 3.45 m, and a 10-m long culvert between the new, 75-m long culvert and the original culvert. The 2.6-m waterfall with its overhanging lip that is 9 m upstream of the original Hudson Street Gully culvert remains unaltered. | |
| dc.identifier.citation | Hicks, B. J., Reynolds, G. B., & Jamieson, P. M. (2001). Assessment of the stream conditions associated with the Hudson Street Gully erosion control works (CBER Contract Report Number 9). CBER. | |
| dc.identifier.uri | https://hdl.handle.net/10289/16679 | |
| dc.publisher | Centre for Biodiversity and Ecology Research, The University of Waikato | |
| dc.title | Assessment of the stream conditions associated with the Hudson Street Gully erosion control works | |
| dc.type | Commissioned Report for External Body | |
| dspace.entity.type | Publication | |
| pubs.commissioning-body | Hamilton City Council | |
| pubs.confidential | false |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- CBER-009 Assessment of the stream conditions associated with the Hudson Street Gully erosion control works.pdf
- Size:
- 822.51 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1