<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">

Assessment of the stream conditions associated with the Hudson Street Gully erosion control works

dc.contributor.authorHicks, Brendan J.
dc.contributor.authorReynolds, Gavin B.
dc.contributor.authorJamieson, Paul M.
dc.date.accessioned2024-07-18T22:14:11Z
dc.date.available2024-07-18T22:14:11Z
dc.date.issued2001
dc.description.abstractBefore the commencement of the Hudson Street Gully erosion control works there were two waterfalls and a 58–m long culvert on the Hudson Street Gully Stream. The works have replaced the 3-m waterfall at the confluence of the stream with the Waikato River with a 75-m concrete pipe culvert with a fall of 3.45 m, and a 10-m long culvert between the new, 75-m long culvert and the original culvert. The 2.6-m waterfall with its overhanging lip that is 9 m upstream of the original Hudson Street Gully culvert remains unaltered.
dc.identifier.citationHicks, B. J., Reynolds, G. B., & Jamieson, P. M. (2001). Assessment of the stream conditions associated with the Hudson Street Gully erosion control works (CBER Contract Report Number 9). CBER.
dc.identifier.urihttps://hdl.handle.net/10289/16679
dc.publisherCentre for Biodiversity and Ecology Research, The University of Waikato
dc.titleAssessment of the stream conditions associated with the Hudson Street Gully erosion control works
dc.typeCommissioned Report for External Body
dspace.entity.typePublication
pubs.commissioning-bodyHamilton City Council
pubs.confidentialfalse

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CBER-009 Assessment of the stream conditions associated with the Hudson Street Gully erosion control works.pdf
Size:
822.51 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
82 B
Format:
Plain Text
Description: